MACC Springfield Civic Center Parking Garage Project – Springfield, MA

PROJECT SCOPE

Precast Services Inc. was responsible for the precast erection of a four-level, 810-piece modern parking garage, that replaced an old garage that existed for 50 years. This project was part of the ongoing revitalization of the current MassMutual Center, in the heart of downtown Springfield, MA. Plans for this garage go beyond just parking, with additional features to include an outdoor event space and lower-level retail and restaurant areas, adding valuable amenities and attractions to the MassMutual Center.

PROJECT CHALLENGES AND CONTRIBUTIONS

Completing the precast erection on schedule required strategic planning to overcome a number of challenges. Working in a busy downtown area meant limited site space, as the MassMutual Center remained open to the public during construction. The limited working space for our team led to our 330-ton precast crane being disassembled directly on Bruce Landon Way, the main street entrance to the civic center, adding fuel to the already busy working environment. In addition, the frigid temperatures of a New England winter, made the precast erection activities even more challenging than they already were for our team and partners. Despite these obstacles, our team’s precision, adaptability, and commitment to safety ensured that we met our deadlines and delivered high-quality results.

PROJECT PARTNERS

Effective collaboration was essential to the success of this project, with each partner bringing their expertise and resources to meet the project’s demands. Working closely with our trusted partners allowed us to navigate challenges efficiently, aligning our efforts to ensure quality, safety, and timeliness at each stage of construction. The project partners included:

  • Precast Provider: Unistress Corp.
  • General Contractor: Daniel O’Connell’s Sons
  • Crane Supplier: Precast Services Inc.

The strong collaboration between all partners allowed us to meet and even exceed expectations.

RESULTS AND IMPACT

Completing this project on schedule despite space limitations and inclement weather highlights our team’s commitment to quality and adaptability. This new structure not only serves as a modernized parking solution but also provides versatile spaces for community events and local businesses, supporting Springfield’s growth.

SCOPE OF PROJECT. This is a block of text. Double-click this text to edit it.
Second Paragraph: OBSTACLES UNCOVERED OR NOTEWORTHY CONTRIBUTIONS
Third Paragraph: OTHER CONTRACTORS INVOLVED IN THE PROJECT
Fourth Paragraph: QUOTE FROM HAPPY CLIENT, OR CONTRACTOR ON PROJECT LEAD
Top
Precast Services, Inc. - Logo for banner
With decades of experience with commercial job sites, we help contractors with large-scale construction projects. The logistics of solving the most complex construction situations is what we thrive on.
Copyright © 2025. Precast Services. All Rights Reserved.
Copyright © 2025. Precast Services. All Rights Reserved.
chevron-down